Melton Mowbray Railway Station opened in 1846 and is owned by Network Rail and operated by East Midlands Railway. It forms part of the Birmingham to Peterborough Line. As part of a scheme of recent improvements Fall Protection specialists Gravity Solutions were appointed to create a safe access scheme of works. As part of this […]
FIND OUT MORE >
The Ascent™ stair unit was specified to create a safe means of access to the mezzanine floor of the Training Centre. Training Delegates use the mezzanine area to undertake controlled rescue training & personnel rescue exercises. The stairs were introduced as part of the training centre design to provide access for groups of trainees who would […]
FIND OUT MORE >
A requirement for maintenance personnel to frequently access the roof areas at the Sky Campus, Isleworth, London led Fall protection and Access & Safety specialists Eurosafe to specify the Ascent Stair Unit. The Ascent™ stair unit was specified to create a safe means of access between roof levels for planned preventative maintenance (PPM) activities. The Ascent […]
FIND OUT MORE >
A requirement for maintenance personnel to frequently access the roof areas at Longford Park School in Greater Manchester led Eurosafe Solutions Ltd to specify a pair of Ascent Step Over Units. Commonly known as “up & Over” step units as they go up & over the obstruction the Ascent Up & Over stair units were specified […]
FIND OUT MORE >
A requirement for maintenance personnel to frequently access the roof areas at Bowling Green Street, Warwick led PTSG Access & Safety to specify the Ascent Step On Unit. Commonly known as “Up & On” step units as they go up & on to the upper roof the Ascent Up & On stair units were specified to […]
FIND OUT MORE >
The Ascent™ Up & Over Step Unit was specified on this existing industrial premises as part of a refurbishment scheme, which included a comprehensive photovoltaic array. The Challenge: Safe access was required between the various roof areas holding photovoltaic panels. The Solution: Open grillage of the Ascent™ Up & Over Step Unit provided a free […]
FIND OUT MORE >
The Ascent™ Up & Over Step Unit was specified on this famous Sheffield landmark building to provide maintenance workers with safe access around the rooftop. The Client: Sheffield Central Library is the city’s largest library and also houses the Graves Art Gallery. The building was constructed in 1929 in the Art Deco style and is located […]
FIND OUT MORE >
The Ascent™ Low Level Bridge Unit was specified as part of a refurbishment scheme that included the installation of additional rooftop plant on this existing industrial building. The Challenge: Preventative maintenance (PPM) was required for the facility. To build a rooftop safe access approach, a height safety specialist contractor was appointed. The height safety specialist identified various […]
FIND OUT MORE >
The Ascent™ Up & Over Step Unit was requested at Edinburgh Airport to provide safe maintenance access across one of the main terminal building’s rooftops. The Client: Edinburgh airport is Scotland’s busiest, with 14.7 million passengers arriving and departing every year. The Challenge: Maintenance routes have always been present across the roof of the main terminal […]
FIND OUT MORE >