Longford Park School, Manchester

Longford Park School, Manchester

A requirement for maintenance personnel to frequently access the roof areas at Longford Park School in Greater Manchester led Eurosafe Solutions Ltd to specify a pair of Ascent Step Over Units. Commonly known as “up & Over” step units as they go up & over the obstruction the Ascent Up & Over stair units were specified […]

FIND OUT MORE >
Longford Park School, Manchester

Bowling Green Street, Warwick

Bowling Green Street, Warwick

A requirement for maintenance personnel to frequently access the roof areas at Bowling Green Street, Warwick led PTSG Access & Safety to specify the Ascent Step On Unit. Commonly known as “Up & On” step units as they go up & on to the upper roof the Ascent Up & On stair units were specified to […]

FIND OUT MORE >
Bowling Green Street, Warwick

Orgreave, Sheffield

Orgreave, Sheffield

The Challenge: Workers needed frequent access to the roof of an office/warehousing facility in Orgreave, Sheffield, to carry out planned preventative maintenance. Eurosafe Solutions were appointed to provide safe access to the roof. The Solution: As part of its safe access strategy, Eurosafe Solutions specified a pair of Ascent™ Rooflight Covers. An Ascent™ Rooflight Cover […]

FIND OUT MORE >
Orgreave, Sheffield

Automatic Opening Vents

Automatic Opening Vents

Automatic Opening Vents (AOVs) are often specified as part of a comprehensive smoke management strategy in the case of a fire. The Challenge: AOVs are often used by maintenance workers as an access point to the rooftop. The open vent on the rooftop poses a potential fall hazard back to the floor level below. The […]

FIND OUT MORE >
Automatic Opening Vents

Mount Snowdon Visitor Centre

Mount Snowdon Visitor Centre

The Ascent™ Fall Protection and Anchor Post was chosen for use on the roof of the visitor centre and café on Yr Wyddfa (Snowdon), Wales’ highest mountain. The Client: The visitor centre is located on the mountain’s peak at 1,085 metres above sea level and attracts around 500,000 visitors every year. On a clear day, […]

FIND OUT MORE >
Mount Snowdon Visitor Centre

Sheffield Training Centre Ladder

Sheffield Training Centre Ladder

The Ascent™ Companionway Ladder was specified to provide access to the upper roof area of Eurosafe’s Sheffield comprehensive working at height training facility. The Client: The Eurosafe Solutions training centre in Orgreave, Sheffield, is one of the leading working at height training facilities in the UK. The centre was once an office and warehouse facility that […]

FIND OUT MORE >
Sheffield Training Centre Ladder

Solar Installation

Solar Installation

The Ascent™ Up & Over Step Unit was specified on this existing industrial premises as part of a refurbishment scheme, which included a comprehensive photovoltaic array. The Challenge: Safe access was required between the various roof areas holding photovoltaic panels. The Solution: Open grillage of the Ascent™ Up & Over Step Unit provided a free […]

FIND OUT MORE >
Solar Installation

Sheffield Central Library

Sheffield Central Library

The Ascent™ Up & Over Step Unit was specified on this famous Sheffield landmark building to provide maintenance workers with safe access around the rooftop. The Client: Sheffield Central Library is the city’s largest library and also houses the Graves Art Gallery. The building was constructed in 1929 in the Art Deco style and is located […]

FIND OUT MORE >
Sheffield Central Library

Gutter Bridge

Gutter Bridge

The Ascent™ Low Level Bridge Unit was specified as part of a refurbishment scheme that included the installation of additional rooftop plant on this existing industrial building. The Challenge: Preventative maintenance (PPM) was required for the facility. To build a rooftop safe access approach, a height safety specialist contractor was appointed. The height safety specialist identified various […]

FIND OUT MORE >
Gutter Bridge

Edinburgh Airport

Edinburgh Airport

The Ascent™ Up & Over Step Unit was requested at Edinburgh Airport to provide safe maintenance access across one of the main terminal building’s rooftops. The Client: Edinburgh airport is Scotland’s busiest, with 14.7 million passengers arriving and departing every year. The Challenge: Maintenance routes have always been present across the roof of the main terminal […]

FIND OUT MORE >
Edinburgh Airport